• Advised a multi-national conglomerate on issues relating to turbine installation on an onshore wind farm and delay/disruption and loss of profit claims arising as a result.
  • Advised an airport company on claims from a main works contractor on a new runway project (GBP100 million), including very significant claims relating to earthworks and AGL systems.
  • Advised a rail operator on substantial claims from a contractor relating to complex contractual interpretation issues, misrepresentation and delay claims.
  • Advised a statutory undertaker on the resolution of GBP70 million of claims from a framework contractor, including high volume, low value repair and maintenance works and a large number of significant network infrastructure projects (amended NEC3 contract).
  • Advised a major gas operating company based offshore in the far east of Russia on very significant deficient design claims relating to the design and construction of one of the world’s largest integrated oil and gas projects (with specific focus on an onshore processing facility).
  • Advised an operator company on claims arising relating to deficient refurbishment of BOP units for offshore rigs in an area of extreme environmental sensitivity.
  • Advising a specialist steelwork sub-contractor in relation to defects, touch up and variation account claims on a power station project suffering significant delays/cost overspend.
  • Advising a nuclear authority in relation to the design and construction of a boiler park on a nuclear site where issues relate to defective welding and pipework.
  • Advising a main works contractor on significant delay claims as part of a wider final account dispute claim on the design and construction of a Premier League training academy, issues including significant claims relating to the M&E works.
  • Advised a specialist chemical engineering sub-contractor in relating to the installation of plant and machinery at a LDPE plant.